As part of the ACT Water Security Strategy, the Bulk Water Alliance (ACTEW, John Holland, Abigroup, GHD) engaged Ecowise Services to undertake the design, supply and installation of the new High Voltage (2.75kV) MCC in the Cotter Raw Water Pumping Station. The project had the usual challenges.
First, a tight timetable for design and construct.
Second, the site was a heritage building from a completely different era, meaning the MCC needed to traverse very tight installation corridors.
Third, the project needed to work around a station that continued to operate throughout the works.
Powering your future.
The electrical industry is changing, new ideas and needs continue to emerge. Ecowise Services is at the forefront of these new industries and ready to support your journey.
Ecowise Services